Tuesday, April 12, 2011

Roll over stack (modified), finished







This is the roll over stack that I have finished by my self. I was asked to install a tub going into a gully. The pipe supports were made out of spare sheet metal and all made by me, they were shown to me by my tutor, on how to make them. The W.C is centre. The p trap is going to a shower and the s trap is connected to the basin.

Roll over stack (modified), putting it together




Putting together a roll over stack (modified)

Sunday, April 10, 2011

Installing a WC


This is a photo after I installed the WC. It was water tested and passed, it had no leaks. The WC was centre and sealed with neutral sealant.

Shower and Mixer



These are the shower and mixer I dismantled and installed again.

Sunday, April 3, 2011