This is the H.W.C I installed, it is mains pressure. I tyred to use less room as possible.
Tuesday, June 21, 2011
Tuesday, April 12, 2011
Roll over stack (modified), finished
This is the roll over stack that I have finished by my self. I was asked to install a tub going into a gully. The pipe supports were made out of spare sheet metal and all made by me, they were shown to me by my tutor, on how to make them. The W.C is centre. The p trap is going to a shower and the s trap is connected to the basin.
Sunday, April 10, 2011
Installing a WC
This is a photo after I installed the WC. It was water tested and passed, it had no leaks. The WC was centre and sealed with neutral sealant.
Sunday, April 3, 2011
Monday, March 28, 2011